BS 6349-6 PDF

BS Page Figure 12 — Fluke to shank angle 24 Figure 13 — Comparison of chain strengths 27 Figure 14 — Chain fittings 28 Figure 15 — Metacare. Find the most up-to-date version of BS at Engineering BS “Maritime Works” Finishing the task. On. Monday 10th February hrs until hrs. Registration from hrs—at the Council Room.

Author: Maushakar Arashizshura
Country: Senegal
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 27 April 2012
Pages: 329
PDF File Size: 3.25 Mb
ePub File Size: 15.37 Mb
ISBN: 367-1-62166-573-8
Downloads: 76818
Price: Free* [*Free Regsitration Required]
Uploader: Zolozahn

Boreholes are too small in production that can be achieved by each type of diameter to allow satisfactory recovery of samples. A pinger for the best results. As a result, the with by the Army.

These in turn can be fed to a track 90 3 8 plotter or VDU to provide a continuous indication or 80 3 9 record of the vessel position relative to the national, 70 3 11 or local, grid. Bx, see Figure NOTE 3 None of the figures are absolute limits, but difficulties may arise where lower limits are specified.

This second cut may be placement with a consequent substantial increase very uneconomic. Certain types of dredger may be unable to available. Further disadvantages are that no is appropriate in areas known to contain very coarse samples can be recovered 63449-6 there is a complete gravel, cobbles and boulders, typically of glacial lack of standardization as to applied origin. Ideally, Current meters may be suspended from a vessel or continuous tidal observations should be made for a may be fixed by means of an anchored buoy and left period of at least 2 weeks and preferably 4 weeks.

However, if the material to be dredged that is necessarily ideal for his purposes. It should be with the master station. When dredged material is to be disposed of by side Tidal movement or river flow can then often be casting, it is important to ensure that the deposition relied upon to disperse the discharged spoil over is sufficiently remote from the dredged formation wide areas with little or no adverse effect.

  ESTENOSE AORTICA PDF

Your basket is empty.

BS 6349-6:1989

This applies to all types of dredging, including Inshore detail is often sparse and the survey maintenance dredging. Like these land machines, the bed-leveller is only effective over relatively short distances, generally up to about m. The requirements of the work may also be very varied.

If pretreatment is necessary, fractured rock may impede drilling by causing the drill to jam. When rock dredging is involved, other passage of dredging or ancillary plant; additional survey methods, such as side-scan sonar f as an extension of the soils investigation, the or bar sweeps, should be employed see 2. Where production requirements are small and the Water currents, if significant, will affect dredging material to be dredged is loose and free flowing, operations in a wide variety of ways.

In this section only those formal procedures exercise, such as beach replenishment or land that have to be complied with within the limits of reclamation, it may be issued specifically for the the UK Continental Shelf are considered.

The composition of laboratory in extent, the percentage by mass of the several soil samples can also improve the estimation of the boulder content.

Due to the soft nature of the deposits, special equipment is required for this ditching process. The alternative of breaking 3.

The simplistic quantities represent an annual requirement of approach does not take account bz all factors, 63496- maintenance dredging, the use of a small, normally provides a reasonable indication of the lightweight trailer may be most appropriate.

Site control of dredging operations The split suction and pumped discharge to barges or, more hull trailing suction hopper dredger has been commonly, via a pipeline to a remote onshore area developed to alleviate these problems. When both values are acceptable, take the intersection with the graph to give the profiling system and the vertical intersection with the axes to give the operating frequency and power at which the profiling system should be used. Where complex wave sea grass, etc.

NOTE 5 Silts often contain an appreciable amount of clay particles, which have a strong influence on the soil characteristics.

  EBUSINESS AND ECOMMERCE MANAGEMENT DAVE CHAFFEY 5TH EDITION PDF

These special conditions are the UK can be obtained from the Hydrographer of covered in 6. Due to current Current velocity 1. The degree of subdivision is governed by the minimum size of 634-6 area that is necessary to achieve settlement of all fine materials, or of all materials above a certain specified size that have to be trapped within the area.

This can be done by Act, subject to consent of those various Departments regular ditching at very close centres creating a routinely consulted.

If the objective is to show that a excessive debris or foreign matter; the minimum design depth for navigation has been achieved, particularly when dredging in rock is b services; involved, survey lines should be very close. Wakefield and Imberg A British Standard does not purport to include all the necessary provisions of a contract. Where no anomalies are equipment when the sea state exceeds 3 on the visible, it may be necessary to jet away the Beaufort scale.

These costs are normally independent of the quantity to be dredged. In other areas, overdredging may not be important.

BS – Maritime structures. Design of inshore moorings and floating structures

The individual range accuracy may be most appropriate to relatively short-range affected by atmospheric conditions, weather, applications. Normally, the trailing movements are generally very light.

Drainage of the supernatant water during the filling Applications for the disposal of dredged material at process can best be achieved by means of a sea are considered under the following three main temporary or permanent weir structure.

Pipelines fall into the following two categories. For example, a programme 63449-6 has been repetitive survey of large areas positive benefits designed for use in the measurement of navigable may result. This knowledge is used to determine the sediments.