ASTM E1646 PDF

ASTM International E Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure Difference. ASTM E(). Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure. ASTM E is the standard test method for water penetration of exterior metal roof panels by uniform static air pressure difference. The ASTM E test.

Author: Milrajas Galkree
Country: Montserrat
Language: English (Spanish)
Genre: Technology
Published (Last): 24 May 2011
Pages: 472
PDF File Size: 5.47 Mb
ePub File Size: 20.97 Mb
ISBN: 200-2-98021-574-4
Downloads: 3831
Price: Free* [*Free Regsitration Required]
Uploader: Tojalar

This is a test procedure. These notes and footnotes shall not be considered as requirements of the test method. For that reason the slope of the roof plays a significant importance.

Although prescribed modifications are outside the scope of this test method, an experienced testing engineer is able to use the principles presented in this test method and generate significant data by isolating specific details and measuring leakage. This test method shall not, by itself, be relied upon to form conclusions about overall water penetration through metal roofs. For specific hazard statements, see 7. These factors shall be fully considered prior to specifying the test pressure difference.

The purpose of this test method is to conduct quality assurance water penetration testing of the roof including panel side laps and structural connections. It does not include leakage at openings or perimeter or any other details. Composite systems in which the source cannot be readily determined are outside the scope of this test method.

  JERZY DUDAA FANI CHULIGANI PDF

Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard. In service, the performance also depends on the rigidity of supporting construction, roof slope, and on the resistance of components to deterioration asgm various causes: Historical Version s – view previous versions of standard.

This process is repeated for a total of three cycles.

ASTM E – Farabaugh Engineering and Testing

Prior to testing a positive static air pressure differential preload is applied. SITC has utilized this test method to assist our clients with their quality assurance testing of metal panel roof systems.

The test is conducted by attaching the chamber to the test specimen. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. Pre-loading is a essential part of the zstm procedure. Link to Active This link will always route to the astk Active version of the standard.

In applying the results of tests by this method, note that the performance of a roof or its components, or both, may be a function of proper installation and adjustment.

A roof contains aastm details.

Read more about what our customers have to say The positive test pressure shall be greater than or equal to 15 pounds per square foot. It is the responsibility of the user of this e16446 to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

  ANDRZEJ STELMACHOWSKI ZARYS TEORII PRAWA CYWILNEGO PDF

The preload test pressure differences positive and negative are to be specified. The calibrated spray asfm shall deliver water uniformly against the roof surface at a minimum rate of five gallons per square foot per hour. A section of calibrated spray racks are set in place 12 inches above the specimen.

Some designs are more sensitive than others to this upward moving water. Practical considerations suggest that every combination of panel thickness, span, and design load need not be ashm in order to substantiate product performance.

ASTM E1646

It is difficult to simulate the identical complex wetting conditions that can be encountered in service, including large wind-blown water drops, increasing water drop impact pressures with increasing wind velocity, and lateral or upward moving air and water.

After applying the preload there is a two minute recovery period. The slope of the roof is significant. Then the specimen is preloaded with a negative static air pressure differential for a minimum of 10 seconds. This test method is a specialized adaption of Test Method E